HOUSE UNDER CONSTRUCTION 1624, 45613 (current issue) |
First available in 1959, the House Under Construction is highly prised by collectors. The problem with this house are the many small parts that are needed to complete it. Selected small parts have been sporadically been reproduced in the FLESH color over the years, but finding the parts that you need can be a problem. We’ve illustrated these parts below along with the color variation that exists for this house. |
House Under Construction Small Parts 1. Roof Joists (notched rafter) (3 each) 2. Single Plank 3. Pile of Boards 4. Group of Boards (to be mounted on the roof) 5. Long Ladder 6. Cement Mixing Tub 7. "Plasticville Construction Co." Sign 8. Short Ladder 9. Bent Boards (go over the door threshold) 10. Wheelbarrow (2 pieces) 11. Bucket 12. Saw Horse Cross Beams (2 each) 13. Saw Horse Legs (4 each) 14. Sandpile 15. Hoe 16. Shovel 17. Rake |
House Under Construction Color Variation | |
The House Under Constructions is highly prized by collectors, especially in the DARK GRAY colored wall variation. This piece is much more difficult to find than the more common LIGHT GRAY version, which is shown on the right for comparison. |
Current Issue House Under Construction |